Major Equipment: Six 572 m3 (3600 bbl) produced water storage tanks, Three parallel particulate filtration trains, Three 33% water injection pumps to inject 1000 m3/d of water each, A pump building complete with floor drain sump and pump, Pump building will house the charge pumps, skim/transfer pump and chemical injection metering pumps, A filter building complete with floor drain sump and pump, An instrument air building, An MCC building complete with new MCC, PLC, VFD, HMI and UPS.